Hindalco Industries, a subsidiary of the Aditya Birla Group, operates a massive 2.5 MTPA aluminium refinery in Tikri, Rayagada, Odisha. To ensure this energy-intensive production facility operates without interruption, Hofincons manages the critical 90MW Captive Power Plant (CPP) that fuels its operations.
The Challenge: Managing Specialized Power Infrastructure
The 90MW Cogen thermal power plant, commissioned in 2013, utilizes specialized technology provided by HTC & HUXI (China). Maintaining this infrastructure requires more than standard oversight; it demands a deep understanding of specific foreign technologies and the ability to manage high-pressure thermal assets.
- Asset Complexity: The facility relies on the flawless operation of Pulverized Fuel (PF) Boilers and complex safety structures, where any downtime translates immediately to production losses in the refinery.
- Operational Scope: Hindalco needed a true “Implementation Partner”, not just a contractor, capable of taking full ownership of Operations & Maintenance (O&M) to drive availability and safety standards simultaneously.
The Hofincons Solution: Integrated O&M and Efficiency Drive
Hofincons deployed a comprehensive O&M strategy focused on technical precision and continuous improvement. We act as the end-to-end implementation partner, ensuring the power plant operates at peak efficiency to support the aluminium refinery.
- 225+ Specialist Personnel Deployed: We established a robust resident team of over 225 experts to handle 24/7 maintenance and operations, ensuring round-the-clock readiness.
- Specialized Technical Care: Our team executes the specialized upkeep of the PF Boiler and manages all safety and maintenance structures, ensuring strict adherence to global safety protocols.
- Kaizen-Led Efficiency: We moved beyond maintenance into value creation by implementing Kaizen efficiency initiatives. These continuous improvement programs have directly resulted in cost savings of approximately INR 20 Lakhs per annum.
Manpower Deployed
Resident experts inclusive of specialized boiler technicians and safety personnel handling 24/7 operations for the 90MW Captive Power Plant we established.
The Outcome: Enhanced Availability and Cost Optimization
The partnership has transformed the power plant into a highly reliable asset for Hindalco. By increasing equipment availability and driving productivity improvements, Hofincons ensures that the 2.5 MTPA refinery receives consistent power. The integration of cost-saving initiatives proves that our O&M model delivers not just operational uptime, but tangible financial value to the client’s bottom line.